What are the specific steps when installing the transition joint body?

2023-04-21

Because the transition joint body can be applied to the use of various industrial enterprises, so it is also a more common joint, and as an important part of the transition, in the installation must not be careless, otherwise it is easy to cause leakage, some special industries and even prone to safety accidents, so we should be clear about the steps of the transition joint body in the installation, Let me introduce the installation steps of the transition joint body in detail:


First, check before installation


Before the installation of the transition joint body, all parts should be inspected to see if there is a shortage of parts, if the parts are damaged, and if there is a misopening phenomenon when connecting.


Two, parts stitching


Assemble and splicing all the parts that can be assembled as a whole to lay a good foundation for the final assembly. In the process, try to ensure the compact connection and avoid leakage.


Three, bolt fixation


All the assembled parts are fixed with bolts and nuts to ensure the firmness of the fixing, but not too tight, which is easy to cause damage to the parts.


Four, adjust the position


Install the final assembled transition joint and adjust the final position to ensure that it can work properly.


5. Test performance


Finally, the performance of the transition joint body should be tested, and the work test should detect whether there will be leakage and whether the installation is loose, so as to ensure that it will not have safety problems.


Through the above introduction I believe that we have a final understanding of the installation steps of the transition joint body, the transition joint as an important transition point of machinery, its significance can be imagined, so it is necessary to focus on the observation of the installation, the step is a step can not be wrong, to avoid serious safety problems.


share